Hydraulic pile driver solar ramming Piling machine
Product Description
Hydraulic pile driver solar ramming Piling machine
Product Description
Hydraulic hammer pile driver
It is widely used in the construction of soft soil pile, such as foundation, harbor, bridge, reservoir, power station and national defense engineering, etc.Hydraulic hammer pile driver has obvious effect of energy saving and emission reduction, which is the mainstream of future development of pile drivers
2, construction geology: highway, railway guardrail pile driver,plus air compressor can play rock).
3, the standard diameter: standard diameter 114-180mm, the largest aperture 200mm.
4, configuration air compressor: Recommended 8 cubic air compressor, for the duration requirements, please configure a large air compressor, powerful, fast.
5, the product advantages: four-wheel drive, turbocharged, powerful.
Model | LT-20S |
Diesel power(KW) | 40 |
Pile diameter mm | 114-220 |
Pile length m | 2.6-3.3 |
Hydraulic system flow(L/Min) | 80-110 |
Rated system pressure(Mpa) | 15 |
wheel track (M) | 1620 |
wheel base(M) | 2070 |
Dimension(L*W*H) | 3200*2000*2900 |
Weight(Kg) | 3400 |
Pile hydraulic hammer weight((Kg) | 80 |
Hydraulic hammer frequency(Bpm) | 500-900 |
Hydraulic hammer working flow(L/min) | 40-70 |
Hydraulic hammer working pressure(Mpa) | 11-14 |
Drill hammer weight(Kg) | 60 |
Our company also has some related products. Steel Bar Bender,CNC Rebar Bender,Steel Bar Straightening and Cutting Machine,CNC Steel Bar Stirrup Bender,CNC Rebar Bending Center,Rebar Cutting Line
FAQ
1.What is the main application for our exploration core drilling rig?
Ans.: Our core drilling rig is suitable for drilling works such as general exploration,geohpysical exploration,road and building exploration,water well drilling,and so on.
2.What is the warranty of our machine?
Ans.:Our main machine enjoys a 6 months warranty(except for wearing parts or special parts),during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.
3.What is the lead time and shipping method?
Ans.:Usually the lead time is 3-5 days, and we send the machine by sea.
4.What kinds of payment terms do we accept?
Ans.:T/T or L/C at sight...